VANE PUMP (for 5L-E) > INSPECTION

for Preparation Click here



1. INSPECT VANE PUMP SHAFT AND BUSHING IN FRONT VANE PUMP HOUSING


    C106282E01
  1. Using a micrometer and caliper gauge, measure the oil clearance.

    Maximum oil clearance:
    0.07 mm (0.0028 in.) or less

    If the oil clearance is greater than the maximum, replace the vane pump assembly.



2. INSPECT VANE PUMP ROTOR AND VANE PUMP PLATES


    C101977
  1. Using a micrometer, measure the thickness of the vane pump plates.

    Standard thickness:
    1.397 to 1.403 mm (0.0550 to 0.0552 in.)



    C119912E01
  1. Using a feeler gauge, measure the clearance between a side face of the vane pump rotor groove and the vane pump plates.

    Maximum clearance:
    0.03 mm (0.0012 in.)

    If the clearance exceeds the maximum, replace the vane pump.



3. INSPECT FLOW CONTROL VALVE
  1. Coat the flow control valve with power steering fluid and check that it falls smoothly into the flow control valve hole under its own weight.
    If it does not fall smoothly, replace the vane pump.



    R007591E01
  1. Check the flow control valve for leakage. Close one of the holes and apply compressed air, 392 to 490 kPa (4 to 5 kgf/cm2, 57 to 71 psi), into the opposite side hole, and confirm that air does not come out from the end holes.
    If air leaks, replace the vane pump assembly.



4. INSPECT FLOW CONTROL VALVE COMPRESSION SPRING


    R008702E01
  1. Using a vernier caliper, measure the free length of the flow control valve compression spring.

    Minimum free length:
    32.3 mm (1.272 in.)

    If the length is less than the minimum, replace the vane pump assembly.



5. INSPECT PRESSURE PORT UNION
  1. If the union seat in the pressure port union is severely damaged, it may cause fluid leakage. In that case, replace the vane pump assembly.